NEWS

 

PRACC UPDATE SIX

Fabrication of the Sports Hall structural frame at Timberbuilt Solutions, Melbourne. The LVL is milled to exact specifications from digital files, assembled and hand finished before shipping to Pingelly (W.A.) for assembly on site.

 

PRACC UPDATE FIVE

The plinths for the Sports Hall columns and mullions are poured and the underground services are laid in. The retaining wall will form a grassy bank at the edge of the veranda deck along the length of the football oval. 

 

PRACC UPDATE FOUR

Milling at Inglewood Products Group in Oldbury (W.A.). The sawn timber is air-seasoned for as long as possible prior to kiln drying and final milling.

 

PRACC UPDATE THREE

Manjimup Plantation Logging - 40 year-old Yellow Stringy Bark trees which will eventually supply the decking, flooring and cladding. These trees reach 45m-50m tall and have a log diametre off 400mm-700mm.

 

PRACC UPDATE TWO

Set out and Footings